Empowering Richmond's Power Grid: 12kV/25kV 9MVA Transformer Installation
About Project
Vayeghan Consulting proudly spearheaded the successful installation of a 9MVA step-down transformer at Kidd 2 Substation in Richmond, BC. As the dedicated Project Manager, I led our team in executing this critical project, aiming to enhance the substation's capacity and elevate voltage regulation in the region
SERVICES DELIVERED INCLUDED:
Strategic Project Management: Vayeghan Consulting orchestrated the entire installation process, ensuring meticulous planning and resource allocation for optimal efficiency.
Effective Communication: Seamless communication with contractors and BC Hydro's engineering team was a priority, fostering collaboration and a unified approach to achieving project objectives.
Technical Expertise and Safety Adherence: With a focus on precision, our team closely monitored the installation process, ensuring strict compliance with technical specifications and safety protocols.
Project Impact: The successful commissioning of the 9MVA step-down transformer has fortified the power distribution network in Richmond. This achievement contributes to a more reliable supply of electricity, addressing the growing power demands of the region.